Corporate & Commercial

Contracts, structures and governance for businesses that need the paperwork to hold when something goes wrong.

Mergers & Acquisitions

Buying or selling a business, from the term sheet and due diligence through to completion and the restraints that follow.

Litigation & Dispute Resolution

Commercial disputes in the NSW, ACT and Federal courts, resolved early where that is possible and run properly where it is not.

Government and Defence

Supplying government and the defence industry.

Technology and Software

Your product scales digitally. Your contracts have to scale with it.

Financial Services

A regulated business, on solid legal footing.

Associate

Sydney or Canberra, five years post-admission and up.

Special Counsel

Sydney or Canberra, typically eight years and up.

Associate Partner

Sydney or Canberra, a practice you are building.

Wahlstation for German Referendare

Sydney or Canberra, open all year.

Articles

Where the law changed, what it now requires, and what a business has to do about it.

Guides

One question worked through end to end, with the provisions and the decisions it rests on.

Case notes

What a judgment decided, and what follows from it for anyone in the same position.

Germany

A German desk for businesses moving between Australia and the German-speaking market.

Singapore

Singapore law where it governs the contract, and the arbitral seat that carries much of the region’s work.

Vietnam

Market entry, supply arrangements and dispute resolution for Vietnam.

Property Law Case notes Property Developement Drafting and clauses Real Estate and Construction

Off-the-Plan Industrial Land: When Can the Developer Walk Away?

When the contract clearly lets it and no statute stands in the way. The Victorian Court of Appeal held that a developer validly ended off-the-plan contracts for industrial lots to keep a rise in land value: the clause gave it that power, and the statutory sunset protections reach only residential contracts.

Aerial view of a new land subdivision, with sealed roads and kerbs running between vacant graded lots before any building starts, beside completed houses
Above. A subdivision before building starts. The Fuller Road West land was zoned industrial and undeveloped when its lots were sold off the plan in 2020.

In short

In Fuller Road West v LVL Transport a developer validly ended off-the-plan contracts for industrial lots to keep a rise in land value. The clause let it end the contracts by reference to its own commercial interests, the Court read the words as written, and the statutory sunset protections in Victoria, NSW and the ACT apply only to residential contracts.

  • A broad discretion to terminate is read in its ordinary meaning.
  • Repetitive drafting defeats the argument that a wide clause must be read down to leave the other clauses work to do.
  • Unfair contract terms were not raised and remain open for newer contracts.

What happened

A developer sold industrial lots off the plan in 2020, ended the contracts in 2022 once the land had risen in value, and the Victorian Court of Appeal held that it was entitled to. Fuller Road West Pty Ltd (Fuller Road) owned about 20.8 hectares of undeveloped land zoned for industrial use at Ravenhall, Victoria. In 2020 it contracted to sell 21 of the 45 lots on a proposed plan of subdivision. Each contract was conditional on the plan being registered within two years of the contract date.

The council issued a planning permit in June 2021 and certified the plan in June 2022, but imposed requirements that had to be met before registration. The plan was not registered until 26 July 2024. As the Court of Appeal put it, “In the meantime, the value of the land increased substantially.”

On 16 August 2022, when it was clear the two-year date would be missed, Fuller Road gave notice ending all 21 contracts. Its solicitors wrote that “market conditions have changed considerably since the Contract of Sale was signed (including interest rates, construction costs, authority delays, etc)”. According to the trial judge, 18 purchasers “appear to have acquiesced in this cancellation”. Three sued for specific performance, an order compelling Fuller Road to complete the sales, and won at trial.

Supreme Court of Victoria, Court of Appeal · 12 November 2026
Fuller Road West Pty Ltd v LVL Transport Pty Ltd [2026] VSCA 266

HeldOrr P, Richards and Kenny JJA. Special condition 8.4 gave Fuller Road discretion to cancel the contracts at any time by reference to its own commercial interests, and nothing in the context required the words to be read down. Fuller Road was entitled to end the contracts to take the benefit of the increase in the value of the land. Leave to appeal granted, appeal allowed, orders for specific performance set aside and the proceedings dismissed.

From the off-the-plan contracts to the Court of Appeal in Fuller Road West Fuller Road West contracted in 2020 to sell industrial lots off the plan; the three contracts later litigated were signed between 15 October and 8 December 2020. The planning permit issued in June 2021 and the plan was certified in June 2022. On 16 August 2022 Fuller Road ended all 21 contracts. The plan was registered on 26 July 2024. The County Court ordered specific performance in April 2025, and the Court of Appeal set that aside on 12 November 2026. LAND VALUE RISES Contracts2020 Permit, certification2021 to 2022 Termination16 Aug 2022 Plan registered26 Jul 2024 Court of Appeal12 Nov 2026 From the off-the-plan contracts to the Court of Appeal in Fuller Road West Fuller Road West contracted in 2020 to sell industrial lots off the plan; the three contracts later litigated were signed between 15 October and 8 December 2020. The planning permit issued in June 2021 and the plan was certified in June 2022. On 16 August 2022 Fuller Road ended all 21 contracts. The plan was registered on 26 July 2024. The County Court ordered specific performance in April 2025, and the Court of Appeal set that aside on 12 November 2026. LAND VALUE RISES Contracts2020 Permit, certification2021 to 2022 Termination16 Aug 2022 Plan registered26 Jul 2024 Court of Appeal12 Nov 2026
2020: the contractsFuller Road West contracts to sell 21 of the 45 lots on a proposed plan of subdivision of undeveloped industrial land at Ravenhall, Victoria. Each contract is conditional on the plan being registered within two years of the contract date.
Figure 1. The developer ended the contracts while it was still progressing towards registration. The plan was registered almost two years later.

The County Court trial judgment was given on 9 April 2025. The Court of Appeal heard the appeal on 27 August 2026.

Law current at 14 November 2026. This article describes one Victorian Court of Appeal decision on the wording of one set of contracts, and the sunset clause legislation of Victoria, New South Wales and the ACT. It does not consider the law of any other state or territory. As at that date, no application for special leave to appeal to the High Court had been identified.

The clause

The clause let Fuller Road decide when to seek registration of the plan and, “given those considerations”, end the contract. In special condition (SC) 8.4 the purchaser acknowledged and agreed that:

(a) the Vendor will determine, at its sole discretion, when to seek Registration of the Plan of Subdivision having regard to, amongst other things, market demand, its financial position, ability to obtain finance, and planning, commercial, practical and other similar considerations and, given those considerations, the Vendor may end this Contract by giving notice to the Purchaser;

[2026] VSCA 266 [12].

Paragraph (b) added that ending the contract under paragraph (a) “is not a ‘sunset clause’ for the purpose of the SLA”, meaning the Sale of Land Act 1962 (Vic). The clause sat among several other rights to end the contract, all leading to the same result for the purchaser: the deposit back and nothing more.

Table 1. The rights to end each Fuller Road West contract.
ClauseWhoWhen
SC 8.2PurchaserThe plan is not registered by the Registration Date, 24 months after the contract
SC 8.3DeveloperThe same event, following the procedure in the Sale of Land Act
SC 8.4DeveloperHaving regard to market demand, its financial position and ability to obtain finance, and planning, commercial, practical and similar considerations
SC 8.5DeveloperAn authority's requirement is too onerous in its opinion, registration is refused, or no acceptable planning permit
SC 17.2DeveloperPlanning permit conditions, or required changes to the plans, are not satisfactory to it in its absolute discretion
Result (SC 8.6, SC 17.3)EitherDeposit refunded in full; no damages or compensation

What the trial judge decided

The trial judge read the clause broadly but held that it could not be used only to capture a rise in the value of the land. He found that the factor which acted on the mind of Fuller Road's decision-maker was “whether the benefit in the increase in value of the land should accrue to Fuller Road or to the plaintiffs”. Fuller Road's counsel accepted at trial that terminating for that reason would be a proper exercise of the power.

The judge accepted that clause 8.4 was a separate right, not cut down by clause 8.3, and that its listed considerations were very wide. But he held that reading it as Fuller Road contended would “reduce the contracts of sale to mere put options granted by the purchasers to Fuller Road”, which “would not be a businesslike outcome or the bargain which businesspeople would be likely to make”. The heading, which referred to an “Inability to complete”, reinforced that view. He ordered specific performance of all three contracts.

Two other rulings were not challenged on appeal. The judge declined to imply a duty of good faith. He did imply a duty on Fuller Road to take reasonable steps to achieve registration at the earliest possible date, and found that it had done so: when it ended the contracts, “all the ducks were in a row” and it was progressing towards registration.

The words gave two separate powers

The Court of Appeal read special condition 8.4 as conferring two separate powers, each exercisable by reference to the same broad list of considerations. The first was to decide when to seek registration. The second was to end the contract. The Court started from the settled approach: a commercial contract is construed objectively, by its text, context and commercial purpose, and while a commercially sensible result is preferred, “the authorities caution judges against allowing their own notions of commerciality to displace the words of the contract”.

The purchasers argued that the termination power was tied to the timing decision, so that Fuller Road could end a contract only for the reasons that had shaped when it sought registration. The Court rejected that on the text: “The words used are ‘given those considerations’ and not ‘given that determination’”. It accepted that the purchasers' reading was open, but described it as “not the most natural reading of that text”, and turned to whether context or commercial purpose justified it.

Repetition did not narrow the clause

The presumption that every clause has work to do did not help the purchasers, because the contracts were drafted to leave nothing out. The purchasers argued that a broad clause 8.4 would swallow clauses 8.3, 8.5 and 17.2, leaving them redundant. The Court, adopting the Western Australian Court of Appeal’s words, described the presumption against surplusage as “a starting point, or preference, not an absolute rule”, with little or no operation where a contract repeats itself out of abundant caution.

“The contracts in this case are prime examples of this style of drafting.” Five clauses allowed termination if the plan was not registered within two years or if conditions on the development were not satisfactory to Fuller Road. Read together, they showed that completion depended on the development proceeding on terms satisfactory to Fuller Road, and that each party could walk away without consequence if the plan was not registered within the agreed two years.

The heading did not change the result. The Court said it bore no clear relationship to the text, and that “Inability to complete” more likely meant an inability to complete the contract by registering the plan within two years. The contracts also lacked the usual clause providing that headings do not affect interpretation, an absence the trial judge noted as perhaps significant.

The bargain the parties made

The trial judge's view that the clause was unbusinesslike was, the Court held, a substitution of his own idea of commerciality for the contract. “The purchasers accepted that this was a bargain that the law would countenance.” The judge had nonetheless concluded that it was not a bargain businesspeople would be likely to make, and in doing so “fell into the error of substituting the judge’s own views of commerciality for the words of the contract and the bargain the parties had in fact made”. The Court explained the commercial logic it saw:

Contrary to the judge’s conclusion, that bargain was not inherently uncommercial or inconvenient. It served a clear commercial purpose for Fuller Road, enabling it to obtain finance for the development while retaining control over the conditions under which the development would proceed. It gave each of the purchasers a low risk opportunity to purchase a lot in a convenient location, if the development went ahead and the plan of subdivision was registered within two years. If that did not occur, the purchasers’ deposits would be refunded in full and they would lose nothing but an opportunity.

[2026] VSCA 266 [64].

Its conclusion on the clause was this:

On its terms, SC 8.4 has an extremely broad operation, giving Fuller Road discretion to cancel the contracts at any time by reference to its own commercial interests — having regard, ‘amongst other things’, to the considerations listed.

[2026] VSCA 266 [65].

It followed that Fuller Road could end the contracts for the reason the trial judge had found: to take the benefit of the increase in the value of the land. The Court did not need to decide Fuller Road's challenge to that finding, or its alternative reliance on clauses 8.1 and 8.3. Earlier, LVL had pleaded that the clause, read this way, would “render illusory” Fuller Road's obligations, but that argument was not pressed.

Why the sunset clause protections did not apply

The statutory sunset clause protections in Victoria, NSW and the ACT apply only to residential contracts, so none of them restrained Fuller Road, and none would restrain a developer selling land that is not residential as each Act defines it. For a residential lot, each regime stops a vendor ending an off-the-plan contract under a sunset clause unless every purchaser consents in writing after at least 28 days' notice, the Supreme Court orders that rescission is just and equitable, or, in NSW and the ACT, the regulations permit it.

In deciding that, each court must consider whether the lot has increased in value, which is the very gain Fuller Road kept. The vendor pays the purchaser's costs of the application unless consent was unreasonably withheld, and a court that permits rescission may also order the vendor to compensate the purchaser. In Victoria the protection attaches to a contract “where the lot is proposed to be used for residential purposes”. The trial judge held that clause 8.3, which invoked that procedure, could not operate in an industrial contract; the Court of Appeal did not revisit the point.

Table 2. The residential sunset clause regimes and their reach.
 VictoriaNSWACT
ProvisionsSale of Land Act 1962 ss 10A to 10FConveyancing Act 1919 s 66ZSCivil Law (Sale of Residential Property) Act 2003 ss 19A to 19E
ReachesA lot proposed to be used for residential purposesA residential lot, as defined by s 66QA unit, a residence or vacant land for residential use
Vendor may rescind onlyWith each purchaser's written consent after 28 days' notice, or by Supreme Court orderWith each purchaser's written consent after 28 days' notice, by Supreme Court order, or as the regulations permitWith each buyer's written consent after 28 days' notice, by Supreme Court order, or as the regulations permit
Court weighs a rise in values 10E(3)(e)s 66ZS(7)(e)s 19D(3)(f)
Inconsistent termsOf no effect (s 10C)Of no effect (s 66ZS(10)); exclusion void (s 66ZU(5))Exclusion void (s 36(1)); the court considers whether a term is intended to avoid Part 2A (s 19D(3)(a))

In NSW the line is drawn by the definition of residential property in section 66Q of the Conveyancing Act 1919 (NSW), which includes vacant land on which the construction of a single place of residence is not prohibited by law, and excludes land “used wholly for non-residential purposes” and land over 2.5 hectares. Whether a lot is inside it turns on that definition and the planning controls, not on how the lot was marketed. The ACT Act reaches only units, residences and vacant land “for residential use”, although it also catches clauses triggered by a stated delay event.

For residential land, those provisions mean a clause's description of itself is not the test. Clause 8.4(b), declaring that the clause was not a sunset clause, would have carried no weight against those provisions. Here the question did not arise, because the land was industrial. Our guide to buying a residential property off the plan covers the ACT protections from the purchaser's side.

What an industrial purchaser in Victoria still has

In Victoria some purchaser protections apply to every off-the-plan contract, industrial included, but none of them restrains a developer's own right to end the contract. The Sale of Land Act 1962 (Vic) requires that the deposit not exceed 10 per cent of the price and be held on trust for the purchaser by the vendor's legal practitioner, conveyancer or licensed estate agent until the plan is registered (s 9AA(1)).

  • The contract must carry a conspicuous notice that a substantial period may pass between signing and becoming the registered proprietor, and that “the value of the lot may change” in that time (s 9AA(1A)).
  • The purchaser may rescind within 14 days after being told of an amendment to the plan that will materially affect the lot (s 9AC(2)).
  • If the plan is amended after the contract in a way that restricts or limits the use of the lot, the purchaser may avoid the sale at any time before registration, unless the amendment results from a public authority’s recommendation (s 10(1)).
  • If the plan is not registered within 18 months, or any other period the contract specifies, the purchaser may rescind at any time after that period ends and before the plan is registered (s 9AE(2)).
  • An agreement to waive a right under the Act to avoid a contract is void (s 14).

The mandatory warning that the value of the lot may change is usually read as a risk for the purchaser. Fuller Road shows it can run the other way. In NSW and the ACT, the off-the-plan provisions, including the NSW rule that deposits be held in trust, are confined to residential lots, and an industrial purchaser has the general law and its contract.

What still limits the developer

On these contracts the trial judge implied a duty on the developer to take reasonable steps towards registration, and that duty did not stop it ending the contracts under an express power. The trial judge implied the duty because purchasers under such contracts are wholly reliant on the vendor to prosecute the application for registration. It requires reasonable steps, not that the vendor “leave no stone unturned”. The duty protects a purchaser against a vendor who sits on the plan. It did not help purchasers facing a vendor that kept registering while it ended their contracts.

The judge, applying Victorian authority, declined to imply a duty of good faith into these contracts, while noting that the High Court may yet hold that such a duty inheres in all contracts. An argument raised in the purchasers' opening, based on English authority, that the power could not be exercised arbitrarily or capriciously was not pursued in closing; the judge accepted Fuller Road's answer that the principle does not apply where the discretion is vested solely in one party. None of this was appealed. We discuss the limits good faith places on a termination power in our note on terminating on someone else's assessment.

Some arguments were simply not run. As the trial judge recorded, “There is no pleaded allegation of inequality of bargaining power, unconscionable conduct, or anything of that sort.” Both surveyors agreed that a 24-month registration date was unrealistic, one calling it “ambitious given a Planning Permit had not issued for the Subdivision before the Contracts were signed”. Yet no claim was made that Fuller Road had warranted the date or engaged in misleading conduct about it.

Unfair contract terms: the question not asked

Neither court was asked whether clause 8.4 was an unfair contract term, and for contracts made since 9 November 2023 that is a live question for any developer selling lots on standard terms. Under the Australian Consumer Law, a term of a small business contract is void if it is unfair and the contract is a standard form contract (s 23(1)). A contract for the sale of an interest in land is a small business contract if “at least one party” makes it in the course of a business employing fewer than 100 persons, or had turnover under $10 million in its last income year (s 23(4)).

A development company formed for one project may meet that test on its own. Whether a contract is standard form is presumed once alleged, and the court must consider, among other things, whether the party has made other contracts in the same or substantially similar terms and how many (s 27). Fuller Road made 21. Against that, Fuller Road submitted at trial, on a different point, that the contracts were not contracts of adhesion (take-it-or-leave-it contracts), pointing to handwritten alterations and to the purchasers being represented by conveyancers. No court decided whether the contracts were standard form.

A term is unfair if it would cause a significant imbalance in the parties' rights, is not reasonably necessary to protect the legitimate interests of the party it advantages, and would cause detriment if relied on (s 24(1)). The advantaged party bears the onus on the second limb (s 24(4)). The Act's examples include a term permitting “one party (but not another party) to terminate the contract” (s 25(b)).

Both sides of that test have material in this case. Fuller Road's power could be used before the Registration Date, when the purchaser had no right of its own, as Figure 2 shows. Its best answer is the one the Court of Appeal gave: the structure let it obtain finance while keeping control of the development, and every purchaser was entitled to its deposit back in full. Under the current regime, proposing or relying on an unfair term in a standard form small business contract is also a contravention for which a pecuniary penalty may be imposed (s 23(2A), (2C)).

When each party could end the contract under the Fuller Road West special conditions Measured from LVL's contract of 15 October 2020. The developer's power under special condition 8.4 could be exercised at any time, from signing onwards. The purchaser's right under special condition 8.2 arose only if the plan was not registered by the Registration Date, 24 months after the contract. The developer gave notice on 16 August 2022, about 22 months in, before the purchaser had any right to end the contract. The plan was registered on 26 July 2024, about 45 months after the contract. Developer, SC 8.4 at any time Purchaser, SC 8.2 after Registration Date NOTICE 16 AUG 2022 Contract 24 months Plan registered about 45 months When each party could end the contract under the Fuller Road West special conditions Measured from LVL's contract of 15 October 2020. The developer's power under special condition 8.4 could be exercised at any time, from signing onwards. The purchaser's right under special condition 8.2 arose only if the plan was not registered by the Registration Date, 24 months after the contract. The developer gave notice on 16 August 2022, about 22 months in, before the purchaser had any right to end the contract. The plan was registered on 26 July 2024, about 45 months after the contract. Developer, SC 8.4 any time Purchaser, SC 8.2 after 24 months Contract 24 mo Registered, 45 mo NOTICE 16 AUG 2022
Figure 2. The developer's power ran from signing. The purchaser's right arose only at the Registration Date, and the developer acted before it.

The current form of the regime applies to contracts made on or after 9 November 2023, to older contracts renewed after that date and, where an older contract is varied after that date, to the varied or added terms. Fuller Road's contracts were made in 2020. An earlier and narrower form of the regime was in force then; whether it could have reached these contracts was not raised. Whether a clause like 8.4 is unfair in a particular contract has not been decided by any court we have identified.

What the decision does not decide

The decision settles how this clause works and leaves several neighbouring questions open.

Table 3. What Fuller Road West decided and what it left open.
QuestionPosition
Could clause 8.4 be used to capture a rise in land value?Yes, decided by the Court of Appeal on this clause
Was Fuller Road's reason more than profit?Not decided; unnecessary
Could clause 8.3, invoking the Sale of Land Act procedure, operate for industrial land?Trial judge: no. Not decided on appeal
Implied duty of good faithRejected at trial; not appealed
Implied duty to take reasonable steps to registerImplied and met at trial; not challenged
Unfair contract terms, unconscionable or misleading conductNot raised
Were the purchasers ready, willing and able to complete?Yes at trial; not addressed on appeal

Outside Victoria, the principles of construction the Court applied are the High Court's and apply nationally. The result turned on the words of this clause, read with the rest of this contract and with no evidence of surrounding circumstances relied on by either side. A clause that ties the power to stated events, or ends it at the Registration Date, would be read on its own words.

If you are buying industrial land off the plan

Read every right the developer has to end the contract, not only the sunset date, and negotiate them before you sign. As the trial judge put it, a clause like Fuller Road's turns the contract into something close to a put option: the developer can require the purchaser to buy at the agreed price, or walk away, and the purchaser receives no option fee for granting that choice.

  • Count the exits. List every clause that lets the developer end the contract, and the trigger for each. Fuller Road had five.
  • Tie the discretion down. Ask that any discretionary right be exercisable only for stated events, or only after the Registration Date, so that it cannot be used while the purchaser has no right of its own.
  • Test the Registration Date. Ask where the planning permit stands. In Fuller Road West the trial judge found that both experts agreed a 24-month date was unrealistic where no permit had issued.
  • Price the option. If the developer keeps a broad right to walk away, ask for a fee or a share of any increase in value on termination.
  • Check the standard form. If either party is a small business and the terms were presented on a take-it-or-leave-it basis, consider the unfair contract terms regime.
  • If a termination is disputed, act quickly. Do not take the deposit back, have evidence that you can fund completion, and take advice on lodging a caveat on the title. Two purchasers here waited eighteen months to sue and had to meet a defence of delay, which failed only because the developer could not show it had been prejudiced.

Related: the property law and real estate and construction pages.

If you are the developer

The decision supports a clearly worded discretionary termination right on industrial or commercial land, but it does not reach residential lots and it did not consider unfair contract terms. The Court recognised the commercial purpose the bargain as a whole served for the developer: obtaining finance for the project while keeping control of the conditions under which it proceeds.

  • Keep residential and non-residential lots apart. A residential lot brings in the statutory sunset regime, and a clause labelling itself as not a sunset clause will not keep it out.
  • Include a clause that headings do not affect interpretation. Its absence gave the purchasers' argument from the heading a footing it would not otherwise have had.
  • Set a Registration Date you have reasonable grounds to meet, and record why.
  • For contracts made since 9 November 2023, assess whether the contract is a standard form small business contract, and record the legitimate interests the termination right protects, such as presale conditions in a finance facility.

Termination rights in commercial contracts turn on their words, as our analysis of material adverse change clauses also shows. Fuller Road West is a reminder that the words are read as written, including when they favour one side.

What our clients say

Reviews left on Google by the businesses and individuals we act for. Updated automatically, not selected by us.

Posted on Google Google
ALEX chen profile picture
1 October 2026
Trustindex verifies that the original source of the review is Google.
I had a great experience working with Boettcher Law. Annie was professional, responsive and very helpful throughout the process. She explained everything clearly and provided practical advice. Highly recommend Boettcher Law and Annie.
Posted on Google Google
vanessa johnston profile picture
30 September 2026
Trustindex verifies that the original source of the review is Google.
Annie, Fabian and Mason were fantastic to work with and went the extra mile when things were not as straightforward as expected. I was acting as Power of Attorney in the sale of my relative's apartment, and they talked me through the additional details that we needed to attend to under these circumstances. Annie was very thorough in all her correspondence and explanations.
Posted on Google Google
Mick d profile picture
14 September 2026
Trustindex verifies that the original source of the review is Google.
When people think of lawyers, they always think expensive,money grabbing,aggravated or only concerned in winning for ego,cash,clout. Boettcher law firm, breaks the bread and is willing to plough the field right next to you all the way. Their work ethics & stead fast approach as a team is commendable. Annie Jin (solicitor) went above and beyond for me, from the gecko. Her relaxed but assertive demeanour was top notch. I was in a real quick sand conundrum,where I was stuck.I’m on a disability pension, I’m scraping by and was pushed into the corner, with the plaintive hoping I’d never be able to get my rightfully owed money. She was banking on expenses of a lawyer I wouldn’t be able to fight,She was right, I’d won $16,063 on a poker machine, I had my landlords bsb & acc number saved as a screenshot right next to my own account. Heat of the moment & didn’t have glasses. I accidentally chose the wrong account. The club, my bank ANZ,Police can’t do a thing about this. You’ll need to fight in court,and lawyers fees to go after that amount, you’ll be lucky if you can even afford the lawyer let alone get any moneys back. Annie spoke to Fabian and they saw,not an easy payout, more importantly they saw me as a human struggling that made an innocent mistake that’s cost me dearly. Boettcher law ;choose not to kick me to the kirb,making me feel weak & insignificant,but instead represent me,and show a lady with a gluten for greed and questionable motives & morals a thing or two. This lady played it out for 18months, yet Fabian had said, like Brad Pitt in Snatch. F#%k it , I’ll do the fight for free. I was contacted by Mason who was my representative 3 days ago to inform me he’d get my money back, and Boettcher Law say as they do, do as they say. I’m pleased to say the small amount of money they got from my payout,was not only very fair,but I insisted for I believed it was a moral thing to do considering the 18months of watching a lady trying to claim her so called cake & eat it too. I couldn’t recommend a better law firm,but also a team of highly proficient humans, who will draw the line in the sand for equality,When humans take advantage of others dignity,bullying ,discrimination,disingenuous,dishonest & show little respect to a fellow human, look out cause you’ve woken a team, that are in it for you, not ego,money,fame. Boettchers there for your pride & giving you back your dignity.rare to find a Law firm all about the community & respect the reality of life & are prepared to help the helpless. Annie Jin, Mason ,Fabian You restored my faith in humanity for me, I’ll never forget your commitment & compassion in helping a wounded soldier out of the quick sand to now having faith in our justice system🙏if your looking for a loyal lawyer don’t look any further, if your looking to lose, Go to another firm, 🙏
Posted on Google Google
K profile picture
K
11 September 2026
Trustindex verifies that the original source of the review is Google.
I am extremely grateful to Fabian and Mason for their outstanding assistance during a very stressful and time-sensitive matter. I was facing extremely tight deadlines, and Fabian took the time to carefully review a substantial amount of material. His advice and responses were consistently clear, precise and thoughtful. His attention to detail gave me enormous confidence that important issues would not be overlooked. Within only one or two days, Fabian assisted me through a difficult negotiation under significant pressure. What I appreciated most was not only his legal expertise, but also his patience, persistence and strong sense of fairness. When I was faced with demands that I felt were unreasonable and considerable pressure to make decisions quickly, his calm and careful guidance gave me the confidence to stay focused, not lose perspective, and make considered decisions. I genuinely believe that this contributed greatly to the outcome we ultimately achieved. I would also like to sincerely thank Mason for stepping in and coordinating matters at very short notice. His prompt assistance and responsiveness were greatly appreciated, particularly given the urgency of the situation. The assistance I received from Fabian and Mason went far beyond what I had expected. Fabian’s professionalism, care, patience and commitment to helping his client were exceptional. It is difficult to put into words how much his support meant to me during such a challenging period. Thank you, Fabian and Mason. I am truly grateful for everything you did for me.
Posted on Google Google
Xiao Yuan Tang profile picture
31 March 2026
Trustindex verifies that the original source of the review is Google.
Fabian and Annie were both great to deal with. Annie was especially very dedicated, always quick to respond, and explained everything really clearly. They made the whole process much easier and less stressful. Really appreciate all their help, and I’ll definitely keep working with them in the future.
Posted on Google Google
Yurica Oh profile picture
22 January 2026
Trustindex verifies that the original source of the review is Google.
I cannot thank Fabian Hoffmann and the team at Boettcher Law enough for their outstanding support. We were given sudden notice of lease expiry right before the Christmas–New Year period, and Fabian responded promptly and professionally throughout what could have been a very stressful situation. His advice was clear, strategic, and commercially sensible, and he guided us through negotiations with confidence and precision. Thanks to Fabian’s expertise, we were able to successfully resolve the matter and recover our bond (with only the agreed rent adjustment deducted), avoiding unnecessary escalation. Highly recommend Fabian to anyone needing reliable, sharp, and responsive commercial leasing advice. Truly a pleasure to work with.
Posted on Google Google
Salim Bio Tchane profile picture
28 November 2025
Trustindex verifies that the original source of the review is Google.
Mr Hoffmann and his team were professional and cordial in helping me attaining my objective even though I live in Africa. I stronngly recommend them to others as their assistance was top notch.
Posted on Google Google
Hannelore Federspiel profile picture
19 September 2025
Trustindex verifies that the original source of the review is Google.
The team at Boettcher Law has been nothing short of brilliant to deal with. They have been my trusted partner when I needed legal services and advice. I can highly recommend Fabian Hoffmann and his team!
Posted on Google Google
Robert Yifu Wei profile picture
4 September 2025
Trustindex verifies that the original source of the review is Google.
Fabian and the team were extremely responsive and helpful with our matter.
Posted on Google Google
C Fitz profile picture
3 August 2025
Trustindex verifies that the original source of the review is Google.
I was referred to Mason at Boettcher Law by a friend as I needed help with a property matter. Mason and Annie were brilliant - they were professional, super responsive and lovely to deal with. They sorted my matter quickly (having become unexpectedly urgent) and their rates were great, especially given the excellent service. Would 100% use them again if needed. Highly recommend.

Common questions about developers ending off-the-plan contracts

Each answer is complete in its first sentence.

Can a developer end an off-the-plan contract because the land has gone up in value?

Yes, if the contract clearly gives it that power and no statute restrains it. In Fuller Road West the Victorian Court of Appeal held that a clause allowing the developer to end the contract by reference to its own commercial interests permitted termination to keep a rise in the value of industrial land.

Do sunset clause protections apply to industrial or commercial land?

No, not in Victoria, NSW or the ACT. The consent and court-order protections apply only to residential off-the-plan contracts. In Victoria, some purchaser protections, such as the deposit cap and the right to rescind if the plan is not registered in time, apply to every off-the-plan contract.

Is a clause that lets only the developer walk away valid?

In Fuller Road West the point was not contested. The purchasers accepted that the bargain was one the law would countenance, and the Court of Appeal enforced the clause as written. Whether such a clause is an unfair contract term was not raised, and remains open.

Does the unfair contract terms regime apply to a sale of industrial land?

It can. A contract for the sale of an interest in land is a small business contract if at least one party makes it in the course of a business with fewer than 100 employees, or has turnover under $10 million. An unfair term in a standard form small business contract is void, and the current form of the regime applies to contracts made on or after 9 November 2023.

What does the purchaser get back if the developer ends the contract?

Under the Fuller Road West contracts, the deposit in full and nothing more. Each termination clause led to a full refund of the deposit, with no right to damages or compensation. Other contracts may say something different.

Does the developer have to try to get the plan registered?

On these contracts, yes. The trial judge implied a duty to take reasonable steps to achieve registration and found Fuller Road had met it; that finding was not challenged. The duty did not prevent the developer ending the contracts under its express power.

Does this decision apply in NSW and the ACT?

Its principles do. The Court applied the High Court's approach to construing commercial contracts, which applies nationally. The result depended on the words of this clause and contract, so a differently worded clause may be read differently.

Is there an appeal to the High Court?

None had been identified as at 14 November 2026. The Court of Appeal gave judgment on 12 November 2026.

Speak to someone about an off-the-plan contract

We act for developers and purchasers on contracts for the sale of land off the plan, and on disputes when a contract is ended before completion.

Sydney+61 2 8201 6400 Canberra+61 2 6232 0600 Frankfurt a.M.+49 69 9675 9832

Related reading

The most recent articles in the same area of law, updated automatically.

Sydney

Canberra

Frankfurt a.M.